07 - Inverness Campus to Inshes Roundabout
(NCR1 and COVID-19 Testing Centre)


Issue
• Pinch point for active travel caused by metal barriers,
  and single shared path on one side of road on western side overbridge.
• Pedestrian and cyclist safety risks due to potential for speeding / extreme speeding
  and need to step into carriageway to social distance.

Proposal
• Convert eastbound carriageway west of Inshes roundabout
  to Inverness Campus junction into segregated 2-way cycle lane
  using water-filled barriers, signage and stencil
  and spraypaint road markings.
• Remove metal barrier west of Inshes roundabout to increase footpath width
  and reduce speed to 20 mph.
• Reduce call-time delay for pedestrians and cyclists at lights-controlled crossing
  at Sir Walter Scott Drive.